Some roads in Western and Central divisions affected by TC Vaianu
Tropical Cyclone Vainanu continues to impact road networks with a number of crossings and roads in the Western and Central divisions either closed, restricted, or affecte
Tropical Cyclone Vainanu continues to impact road networks with a number of crossings and roads in the Western and Central divisions either closed, restricted, or affecte
Semo Bypass is open to all traffic; however, the road has been damaged.The Fiji Roads Authority says material on the side of the bypass has washed away due to heavy rain
Semo bypass road along the Queens Highway in Sigatoka is closed due to flooding.Sigatoka Police say the bypass has been flooded since yesterday afternoon. Stay with us
Some roads in Lautoka, Nadi and Sigatoka are closed due to flooding.The Fiji Roads Authority says Nawai Crossing, Arolevu Crossing and Chuni Lal Crossing in Nadi are clos
Vehicles travelling through Sigatoka Town are being advised to expect temporary disruptions as the Fiji Roads Authority carries out scheduled road maintenance works in th
The full deck replacement of Nasau Bridge 1 along Nasau Road, Nadi, has been completed and is now fully open and accessible to the public.The project involved the removal
The Rewa Vutia Road Dredging Project has officially begun, marking a major step forward in improving infrastructure and connectivity for communities in the Rewa corridor.
Following the damage caused by heavy rain and flooding due to Tropical Cyclone Urmil, the Fiji Roads Authority has activated emergency response measures and mobilized
A total of 71 roads and crossings have been damaged or affected following the recent severe weather associated with Tropical Cyclone Urmil, with 51 currently closed and 2
Both lanes on Queen's Highway at Namatakula are open.The Fiji Roads Authority team have cleared the landslip that occurred this morning.Meanwhile, a heavy rain w
Works are still underway to clear a lane along the Queen's Highway after a landslip occurred at Namatakula earlier this morning.The Fiji Roads Authority says their tea
One lane of Queen's Highway is currently closed as a landslip has occurred at Namatakula between Navua and Sigatoka.The Fiji Roads Authority says a team has been mo
Several roads and crossings across the Western, Northern and Central divisions remain flooded and inaccessible following recent heavy rainfall, with authorities urg
A fallen tree has caused a partial blockage on Queen's Highway past Melrose Bridge near Nayawa Junction in Sigatoka, disrupting traffic movement in the area.The Fiji Road
Nalele Village and Semo Village were commended for their swift support following the collapse of a section of the Queens Highway, where a Government delegation led by the
The bypass along the Queen's Highway at Semo Village will be open to the travelling public from midnight tonight.The Fiji Roads Authority (FRA) says that final works on t
Works on the temporary bypass road at Semo Village along the Queen's Highway are now in their final stages, with the route expected to open to the public soon. The urgent
The bypass near Semo Village along Queen's Highway is expected to be constructed within the next few days, although the government has not provided a specific timeline fo
The Fiji Roads Authority has announced a temporary full closure of the Wainibau Bridge along Baulevu Road from 8pm this Saturday until 5am this Sunday, to allow essential
Fiji Roads Authority contractors are continuing construction of the by-pass road near Semo Village along Queens Highway after a section of the road at the Armco crossi
The section of road pavement at the Armco crossing has experienced a slip and is currently flooded underneath. The Fiji Roads Authority says their team is on site and awa