Fijivillage
19 February, 2026, 6:59 pm
Central - 25°C Rain
19 February, 2026, 6:59 pm Central - 25°C Rain

Traffic trial to begin Monday along Suva-Nausori corridor to ease peak hour congestion

Traffic trial to begin Monday along Suva-Nausori corridor to ease peak hour congestion

By Rashika Kumar
22/05/2025

People can hope for some relief while travelling to work in the morning as trials to ease traffic along the Suva to Nausori corridor is expected to begin on Monday.

The Fiji Roads Authority says preliminary work such as those underway in Samabula and other parts of the highway will be undertaken this week.

The Ministry of Transport with FRA and the Land Transport Authority conducted two public consultations before beginning the trial.

As part of the 1 month trial, 12 key traffic hotspots have been identified along the Suva to Nausori corridor.

These include Princes Road to Lakeba Street, Grantham Road to Mead Road roundabout, Sukanaivalu Road to Kinoya lights and Cunningham lights, Wainivula junction and Centre Point lights, Valelevu to Matanikorovatu near Rishikul Sanatan College, Laqere lights, Valelevu to Laqere – Matanikorovatu lights, Makoi lights, Kalokalo Crescent Traffic lights, Omkar traffic lights, Wainibuku roundabout, Davuilevu Housing lights, LDS traffic lights, Waidamudamu traffic lights and Koronivia traffic lights.

While speaking during a public consultation in Nakasi earlier this month, FRA Acting General Manager Taufa Vakamino says they have outlined a series of immediate and long-term measures to ease traffic flow through the busy corridor, which continues to suffer from severe congestion during peak hours.

He highlighted common issues across these locations include fixed-time traffic signals, short turning lanes, lack of slip lanes, and persistent double-parking of buses, particularly in front of bus stops and schools.

At the Princes Road–Lakeba Street junction, the right turn into Ono Street will be prohibited and turning bays will be extended to ease traffic build-up. Similar measures will be adopted at Grantham Road and the Nabua Town Centre, where directional arrows will be added and enforcement stepped up against double-parking.

He says one of the most congested areas, between Sukanaivalu Road and the Kinoya traffic lights will see a major upgrade to traffic light systems.

Vakamino says these will be reconfigured to SCATS - Sydney Coordinated Adaptive Traffic System - and FlexiLink to allow signal timings to adapt to real-time traffic conditions.

He says a new slip lane into Cunningham Road will also be added.

Vakamino says for the heavily congested Valelevu and Laqere zones, a trial roundabout is under consideration.

They also plan to block Kings Road access from Rishikul and introduce outside-lane flow-through systems while slip lanes will be installed at Matanikorovatu to help reduce traffic pressure.

Vakamino says at the Adi Davila intersection, lane extensions and a split lane for turning traffic will be implemented.

He says traffic signal upgrades and improved road layouts are also planned for other hotspots such as Kalokalo Crescent, Omkar Road Junction, Waidamudamu and the FNU traffic lights in Koronivia.

FEATURE NEWS
EXCLUSIVE : I go to the FICAC office after hours to support my wife - Vakalalabure
Tevita Vakalalabure, lawyer and husband of Acting FICAC Commissioner, Lavi Rokoika, has today confirmed that he goes to his wife's FICAC office when s...
2 hours ago
LATEST NEWS
Fiji Airways says sexual harassment clause in Employment Bill sets ‘impossible legal standard'
Fiji Airways has warned that the Employment Relations Bill’s requirement for employers to eliminate sexual harassment imposes an unrealistic and ...
2 hours ago

5 out of 7 people charged in Rewa Street and Flagstaff drug bust case plead not guilty
The Chinese, Federated States of Micronesia, and Fijian nationals charged in three separate Rewa Street and Flagstaff drug bust cases took their ...
3 hours ago

Semo bypass to open from midnight tonight
The bypass along the Queen's Highway at Semo Village will be open to the travelling public from midnight tonight.The Fiji Roads Authority (FRA) says ...
4 hours ago

$2.5B Emerald Bay Project advances with 184 residential lots
The $2.5 billion Emerald Bay Development in Nadawa is progressing well with the development of 184 residential lots as part of its first phase, ...
4 hours ago

Lautoka Central Head Boy advocating for drug-free and responsible living
Lautoka Central College Head Boy, Deevansh Singh is urging students to stay away from drugs and take greater responsibility in protecting the ...
5 hours ago



Stay tuned for the latest news on our radio stations

CFL radio frequencies
IN DEPTH
Minister ready to repay business class air fare for wife as concerns grow about Sports Council deals
I was invited to travel to New Zealand by the Fiji Sports Council for a grassroots 7s tournament in 2024, I travelled business class but it was ...
13 days ago

Malimali and others filed for judicial review into COI
The application for leave for the judicial review has been made by former FICAC Commissioner Barbara Malimali, former Attorney General Graham Leung ...
13 days ago

Malimali’s legal battle against President, PM and AG
Another legal battle starts today as sacked FICAC Commissioner, Barbara Malimali takes her matter to court against the President, Prime Minister and ...
14 days ago

TOP