The Fiji Roads Authority has started carrying out night maintenance works at the Knolly Street intersection in Suva.
FRA’s Acting Chief Executive Officer Robert Sen says the existing pavement will be replaced by a concrete layer top as the finishing.
He says their main aim is to remove the badly deformed surface which has deteriorated over the high stress of vehicles driving along this roundabout and the connecting roads.
Sen adds that some of the other works included repairing footpaths, removing and replacing kerbs and channels, improvement of line marking and erecting proper standard signages.
The total cost of these works is around $635,586.
Stay tuned for the latest news on our radio stations