A temporary 40 metre Bailey Bridge has been installed beside the existing Vugalei Bridge along Kings Road while the existing bridge deck will be demolished and reconstructed.
A new deck will be built on the old bridge.
Fulton Hogan Hiways Special Projects Manager Eddie De Vries says the existing bridge structure went through emergency repairs in early July.
De Vries says the bridge was first launched was on the first of September when they moved the bridge across 10 metres.
He says there are no permanent traffic restrictions leading up to and over the Bailey Bridge.