Feature

$20M Waimanu Pump Station Unveiled

$20M Waimanu Pump Station Unveiled
People living along the Suva-Nausori corridor, Lami and high areas can expect a steady water supply after the Interim Public Works Minister, Timoci Natuva today unveiled the two $20 million pumps at the Waimanu Pump Station.

As the Waimanu Pumping Station supplies around 60% of water to the Tamavua treatment pump through the Savura Station, Natuva said these two pumps would act as back-up whenever the water levels at Savura are low.

He added the new pumps would then directly pump raw water to Savura, ensuring that a steady water flow remains for those living in densely populated areas along the Suva-Nausori corridor and even to Lami and parts of Walu Bay.

This is after the Ministry noted that since the Pump station was built in 1969 to cater for a small population, the Suva population had grown to over 200 000 people this year and the pump stations were not able to cater for the growth.

The rehabilitation of the Waimanu Pumping Station was made possible through the $170 million loan from the Asian Development Bank.

Stay tuned for the latest news on our radio stations

CFL radio frequencies
Scoreboard
Full Time
Cowboys 12–82 Roosters
Full Time
Dragons 22–28 Dolphins
Full Time
Storm 22–36 Bulldogs
8:10AM
Ireland vs Argentina
11:40PM
Italy vs South Africa
2:10AM
Scotland vs New Zealand
Full Time
Ra 17–10 Northland
Full Time
Yasawa 43–15 Navosa
FULL TIME - U16 SOUTHERN ZONE
Suva Grammar 39–7 Labasa Coll.
FULL TIME - U16 SOUTHERN ZONE
Rt Simione M. 12–5 Dreketi Cent.
FULL TIME U18 SOUTHERN ZONE
Nasinu Sec 21–20 Holy Cross Coll.
Full Time
SNR Men Suva 28–26 SNR Men Ba
FULL TIME - UNDER 20
Malolo 32–24 Taveuni
Rewa vs Naitasiri
Full Time
Suva 34–30 Ba
11:00AM
Namosi vs Macuata
Nadi vs Kadavu