In six months time, water problems will be a thing of the past for the two main areas in the Central Division, in particular the Delainavesi and Veisari corridor.
That is the assurance from the Minister for Infrastructure and Transport Pio Tikoduadua.
He said the people living outside the areas not covered by the Water Authority of Fiji will also be assisted without delay.
Tikoduadua said his ministry will continue their rural electrification programme and those communities that have contributed their 10 percent share will receive their supply either through the grid or solar power.