Feature WAF Water Feature

22 generator sets could arrive later this year to ensure no disruption in water supply during power outages – WAF

22 generator sets could arrive later this year to ensure no disruption in water supply during power outages – WAF
WAF Chief Operations Officer Seru Soderberg

22 generator sets are expected to be installed at critical Water Authority of Fiji sites by later this or early next year to ensure no disruption in water supply during power outages.

WAF Chief Operations Officer Seru Soderberg says the tender for the generator sets will be closed at the end of this month.

He says after that the tender will be submitted to the WAF Board for approval in March.

He says the cost will depend on the tender because there are various sizes.

Soderberg says in the interim, they have hired generator sets for the long term which are already sitting at their critical assets.

He admits that not all of these hired generator sets can cater for an automatic switch over during an unplanned power outage but upgrades are already underway.


Stay tuned for the latest news on our radio stations

CFL radio frequencies
Scoreboard
9:50PM
Roosters vs Sharks
6:05PM
Warriors vs Knights
3:00PM
Suva vs Malolo
3:00 pm
Taveuni vs Kadavu
3:00 pm
Tailevu vs Lautoka
11:00AM
Rewa vs Nasinu
11:00AM
Tailevu vs Lautoka
11:00AM
Suva vs Namosi
7:00AM
Brentford vs Chelsea
11:30PM
Spurs vs Aston Villa
2:00AM
Everton vs Ipswich Town
10:05PM
Fiji vs Japan
7:00PM
Canada vs USA
2:00PM
PNG vs Vanuatu
7:00PM
Fiji vs Solomon Islands